Infrastructure Tour at Bagnell Dam

Home|Previous Page|Next Page

100_6861.avi
climbing back up the spiral stairs to the deck. yeah it's pretty dark in there.
100_6864.jpg
The rotating field from thye unit under repair is sitting there. It weighs 75 tons and is coated with red glyptol.
100_6867.jpg
Brian with a wrench. Bagnell Dam has a tool room the size of a hardware store. Everything in its place.

Page 16 of 18